DownclimbEarly access
Menu

01The upgrade brief

For each release, a model writes the upgrade brief and plan, and starts nothing.

Shown: its brief for 0.15.0 on this database, and the approval page that follows it. The model is open-weight, served by us on cloud GPUs rented by the hour in Frankfurt, and works only for operated databases; on Self-belay the stager plans from the release manifest alone.

Sample model brief for 0.15.0: the stored format moves one way, 6 to 7; a tested restore point first; memory_text and doc_text to rebuild; readers first.
Sample approval page: stages 1 to 4 labelled reversible, stage 5 one-way, an approve button on each that only your approvers' passkeys can sign.

Sample: '0.15.0. Fixes a text-search bug. Stored format 6 to 7. Readers first. Two new required settings.'

Does the model read your memories? It reads release notes and counters.

Never a node, edge, property value, vector, text or query: none of them reaches our control plane. It reads the notes between your version and the target, and counters such as links still pointing at deleted entries, cache budget and open-file limit.

Sample plan for 0.15.0, stage by stage: 21, 24 and 4 minutes, 16 plus cut-over, day 14, and one line unsure whether doc_text needs rebuilding.

The plan it proposes for 0.15.0, including the one thing it is unsure of.

An index it scores under 0.70 is rebuilt on the clone and checked before you see the plan. From March 2027 the briefs our engineers correct fine-tune it, with index names reduced to kind and size.

Stage times come from a small regression model of past clone runs.

  • Stage orderset by rules from the release manifest
  • Rebuildmemory_text and doc_text; vector indexes untouched
  • Clone checksthe release's required settings and the ten check searches
  • Unsurewhether doc_text needs it; scored 0.62, rebuilt on the clone

Sample plan for 0.15.0, with an estimate on every stage.

The model may call a stage reversible only when a restore point exists and its test restore passed.

Every other stage it marks one-way and leaves to a person. If a restore point is missing or its check failed, every stage after it turns one-way and the plan stops until someone decides.

Only your approver can sign a stage; neither the model nor our engineer can.

Your approver is your platform engineer, or anyone else you name. Approvals are passkey signatures checked by the agent in your account, so our control plane cannot forge one.

  • The model

    proposes, and can neither approve nor start

  • Our engineer

    corrects each brief, can pause, cannot approve

  • Your approver

    signs every stage, and alone signs a one-way one

What our operators can reach

Your request has been received.

Expect a message from Downclimb. It goes to the address you gave.